11-1-'24,
---Banned on Rumble,---
''Daily Constitution'',
''Hillbilly Friday''
(pics on wimkin)
I had a great primary title of this segment,
but some resource is burying the lead here
(more later, stay tuned).
or,
''Situation Desperate, but not Serious''
(war story paperback from the early 60's)
Winter prep update;
The big components are in the jar. Mostly what is left are 20 min. mini-projects that can be filled in as weather permits. I have 2(?) more good days of upper 60F, clear sky, here to get the cover stretched and the planking reapplied. I should be able to post completed pics (of the upper deck only) next week.
As one can see, I got dyslexia, (pics 1&2?) get over it. The only way I can get consistent and accurate measurements is to place the component at location and draw the lines then. That even failed (twice) as seen in the pics. The center attachment security support is not completely required, but good to have.
The billboard cover will be draped about 3' over the west and north sides, down the container to be used at a later time, to -potentially- increase the efficiency of the heat gather for the heat pump. That will leave about 1' on the deck areas to tuck, cut, screw, or deal with as conditions allow. Set any mechanical attachment for the ''tarp'' like a painting canvas on a frame. Star from the center on all sides, and work out (in case nobody ever told ya that trick).
This will bring up the ''R'' value of the ceiling to about 40 , with the steel air barrier container, the interior cover, the 6'' foam base, the 3'' fiberglass batt. (backed), the tarp, and the ½'' decking.
In Album: Kevin Espeseth's Timeline Photos
Dimension:
1600 x 1200
File Size:
609.19 Kb
Be the first person to like this.