Judith Johnson
on November 11, 2022
8 views
NEW 🚨 Construction at the Obama Presidential Center in Chicago has been suspended after discovery of a noose
READ: https://insiderpaper.com/construction-suspended-at-obama-center-after-discovery-of-noose/
Dimension: 1280 x 854
File Size: 67.7 Kb
Like (1)
Loading...
1
Paul
It adds character
November 11, 2022
Mimiof5
Perhaps the constuction crew use this to hoist small materials up for easier access.
November 11, 2022 Edited
Paul
I bet bubba Wallace found it .
2
2
November 11, 2022