Ponder this for a moment. 🤔The wind farm in Mt. Pulaski has been running for 3 1/2 years. They have been replacing the generators in all the wind towers. There are 100 of them in this wind farm. So evidently the life span on the generators on these things is about 3 to 4 years. It takes 12 semi trucks and trailers, A 9 axle 500,000 pound crane, A 100,000 pound crane and 12 pick up trucks to change each generator. That is a huge amount of diesel fuel being used to maintain these wind towers. And the "Green Groups" would like You to believe they are all fueled by magic fairy dust.
In Album: 8Ragnar Lothbrok8's Timeline Photos
Dimension:
960 x 837
File Size:
41.25 Kb
Haha (1)
Loading...
Dislike (1)
Loading...